Air sealing · West Kelowna, BC

Air sealing in West Kelowna.

West Kelowna builders are a short trip across the bridge, and a lot of the work here since 2023 has been rebuilding after the McDougall Creek wildfire. Rebuilds go in under today's Step Code, not the code the original house was built to.

Short answer

Okanagan AeroBarrier seals West Kelowna homes to a measured ACH50 target, including wildfire rebuilds after the 2023 McDougall Creek fire. A rebuild has to meet the current BC Energy Step Code, which is Step 3 minimum province-wide with an on-site airtightness test, so an owner replacing an older house often faces an airtightness number the original never had to hit. A measured seal gets the rebuild to its target before the energy advisor tests.

Rebuilding after McDougall Creek

A house built decades ago never had a blower-door number. Its replacement does. Since May 1, 2023, Step 3 has been the minimum for Part 9 homes everywhere in BC, and every Step Code home is tested for airtightness on site. For a homeowner rebuilding on an insurance timeline, a failed test is a delay they did not budget for.

I have sealed wildfire rebuilds in West Kelowna and elsewhere in BC. The approach is the same as any new build, but the stakes on schedule are higher, so I usually recommend booking the seal around the mid-construction test so the final test is a formality.

New subdivisions and hillside builds

Outside the rebuilds, West Kelowna work is mostly new single-family and hillside custom homes. Complicated envelopes with lots of corners, cantilevers and penetrations are where hand sealing misses the most, and where a seal that reaches every gap at once earns its keep. How a seal day runs.

Requirements and rebates

Step 3 is the provincial minimum and applies in West Kelowna. Check with the City of West Kelowna building department for anything above it. Step Code airtightness explained.

Written by Sebastian Motora, owner-operator. Last reviewed October 7, 2026.

West Kelowna air sealing: common questions

Does a wildfire rebuild have to meet the Step Code?

Yes. A rebuild is new construction under the current BC Building Code, so Step 3 is the minimum and the house gets an on-site airtightness test. Confirm details with the City of West Kelowna.

Can you work to an insurance rebuild schedule?

That is the reason to book early. Call me at framing so the seal is lined up with your mid-construction test.

Do you come to West Kelowna regularly?

Yes. It is a short trip from my Kelowna base.

Building in West Kelowna? Send me the project.

Plans, target step, stage and timeline. You talk to the owner who runs the seal, usually the same day.

Call Sebastian Quote